Skip to content
Latest news

Forest shelterbelts rehabilitated across 132 ha in Orhei District

The work cost approximately 2.7 million lei, and maintenance of the shelterbelts is the responsibility of the local authorities in Bolohan, Ivancea and Susleni.

by 2 min read

Drafted with AI assistanceOriginal checked and approved by Vasile Ceban

Machine-translated from Română.Read the original

Listen to this article

AI-generated voice · ElevenLabs

Ask AI about this article

A green field stretches to a line of trees beneath a clear blue sky.
A green field stretches to a line of trees beneath a clear blue sky.Photo: Ministry of Agriculture and Food Industry

In brief

  • The Ministry of Agriculture and Food Industry reported on 25 November 2026 that the total cost of the work was approximately 2.7 million lei.
  • The ministry’s report published on 25 November 2026 includes the planting of 2,666 pyramid-shaped poplar saplings and 250 walnut saplings.
  • According to the ministry’s announcement on 25 November 2026, the local authorities in Bolohan, Ivancea and Susleni will monitor and maintain the rehabilitated shelterbelts.

More than 4,000 ha of agricultural land in Orhei District are expected to be protected through the rehabilitation of 132 ha of shelterbelts in Bolohan, Ivancea and Susleni. The Ministry of Agriculture and Food Industry announced on 25 November 2026 that the Food and Agriculture Organization of the United Nations (FAO) had completed the work.

What does this mean for you?

For farmers in Bolohan, Ivancea and Susleni, the intended benefit is to reduce the exposure of land to wind and soil erosion. According to the Ministry of Agriculture and Food Industry, the rehabilitated shelterbelts will also help preserve soil moisture.

The agricultural area that the intervention is expected to protect exceeds 4,000 ha, according to the ministry. This area represents the agricultural land targeted by the effects of the work, while the 132 ha rehabilitated are occupied by shelterbelts.

What work has been completed?

The intervention covered 69 forest plots and combined care for existing trees with planting in areas left without trees. The last 2,440 saplings were planted in Susleni, thus completing the rehabilitation work.

The first stage, completed in October, included removing dead or damaged trees and clearing degraded vegetation. The timber obtained from this work was handed over to the mayoralties of the beneficiary localities.

The total cost of the work is approximately 2.7 million lei. FAO carried out the intervention in partnership with the Forestry Research and Management Institute, whose specialists assessed each plot before work began.

Who will maintain the shelterbelts?

The local public authorities in Bolohan, Ivancea and Susleni will remain responsible for monitoring and maintaining the shelterbelts. The work was funded by the Global Environment Facility as part of a project implemented by FAO together with the Ministry of Agriculture and Food Industry and the Ministry of Environment.

Across the Republic of Moldova, approximately 28,000 ha of shelterbelts need rehabilitation or maintenance, according to the ministry. The institution notes that most of these plantations were established several decades ago and are ageing, degraded or inadequately maintained.

Sources

  1. Ministerul Agriculturii și Industriei Alimentare — FAO a finalizat reabilitarea a 132 ha de perdele forestiere de protecție în raionul Orhei

Written with AI assistance from the official sources above and checked by the editors.

What we checked (11 claims and their sources)

Every figure, date and name in the article, with the official source it comes from (in Romanian). Each claim is checked against its source automatically, then an editor approves the article.

  1. Ministerul Agriculturii și Industriei Alimentare a publicat anunțul pe 25 noiembrie 2026. — Ministerul Agriculturii și Industriei Alimentare
  2. FAO a finalizat reabilitarea a 132 ha de perdele forestiere în Bolohan, Ivancea și Susleni, raionul Orhei. — Ministerul Agriculturii și Industriei Alimentare
  3. Potrivit ministerului, intervenția va contribui la protejarea a peste 4.000 ha de terenuri agricole. — Ministerul Agriculturii și Industriei Alimentare
  4. Valoarea totală a lucrărilor este de aproximativ 2,7 milioane de lei. — Ministerul Agriculturii și Industriei Alimentare
  5. Pentru completarea golurilor au fost plantați 2.666 de puieți de plop piramidal și 250 de puieți de nuc. — Ministerul Agriculturii și Industriei Alimentare
  6. Lucrările au cuprins 69 de sectoare forestiere. — Ministerul Agriculturii și Industriei Alimentare
  7. Ultimii 2.440 de puieți au fost plantați la Susleni. — Ministerul Agriculturii și Industriei Alimentare
  8. Prima etapă a lucrărilor a fost finalizată în octombrie. — Ministerul Agriculturii și Industriei Alimentare
  9. Autoritățile publice locale din Bolohan, Ivancea și Susleni vor monitoriza și întreține perdelele forestiere. — Ministerul Agriculturii și Industriei Alimentare
  10. La nivel național, aproximativ 28.000 ha de perdele forestiere necesită reabilitare sau întreținere. — Ministerul Agriculturii și Industriei Alimentare
  11. Lucrările au fost realizate în parteneriat cu Institutul de Cercetări și Amenajări Silvice și finanțate de Facilitatea Globală de Mediu, într-un proiect implementat de FAO împreună cu Ministerul Agriculturii și Industriei Alimentare și Ministerul Mediului. — Ministerul Agriculturii și Industriei Alimentare
RomânăРусский

Newsletter

Moldova, in your inbox

The stories that matter, every morning, in a single email. You choose what you get and in which language.

  • Free
  • No spam
  • One-click unsubscribe
What you want to receive
Email language